Complete or Update
specifications section for this design
Prototype design
Design & Simulate (iterate till done)
Review design
Layout PCB or hardware
Complete review before producing design
Purchase parts needed
Fabricate PCB or hardware
Test prototype
Design prototype test hardware
Purchase parts for test hardware
Assemble test hardware
Test hardware
Modify design
Test modifications
Milestone at prototype/pilot transition
Pilot (10%) production
Update specifications
Update Design & Simulate
Layout PCB or hardware
Purchase parts needed
Fabricate PCB or hardware
QC incoming assemblies
Test pilot
Purchase parts for production test hardware
Assemble production test hardware
Test
Modify design
Milestone at full production transition
Production
Update specifications
Update Design & Simulate
Update Layout for PCB or hardware
Purchase parts needed
Fabricate PCB or hardware
QC incoming assemblies
Test production
Purchase parts for any additional test hardware
Assemble any additional test hardware
Test
Update documentation
Milestone at production completion
Integration of modules and
subsections
Test and integrate with neighbors, then subsystem,
then system.
Purchase parts for additional integration hardware
Assemble additional integration hardware
Integrate
Move hardware and assemble and
test at C0
Take Data.