Muon Trigger WBS Outline


Electronics


- (update) specification: write/review/milestone
- preliminary design, behavioral simulation
- design capture, verification via simulation
- procure parts
- perform layout, emc analysis, fabricate
- assemble first, test first
- assemble balance, test balance
- (update) final specification, documentation
- review, rework as required, milestone (each board project)
- final review, rework as required, milestone (muon trigger)


Packaging, Powering, Monitoring, Cooling and Protection
Alarms and Limits Interface (to the C/M&T)
Hardware and Software Specific To Muon Trigger Development and Testing
Software
Muon Trigger Integration and Testing
ES&H
Transportation to and Installation and Testing at C0
Muon Trigger Task Management